Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : SC2350023 Federal Type : C
Water System Name : CLIFFS AT GLASSY THE (SC2350023) State Type : C
Principal County Served : GREENVILLE Primary Source : GW
Status : A Activity Date : 08-01-1992

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 11-01-2021 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
B23016 PLANT(B23016) SHADY VALLEY LANE IOC IOC METALS (2005) 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
B23016 PLANT(B23016) SHADY VALLEY LANE SOC SOC 1 RT 9Y 01-01-2020 to 12-31-2028 01-01-2029 to 12-31-2037
B23016 PLANT(B23016) SHADY VALLEY LANE VOCR VOLATILES 1 RT 6Y 01-01-2020 to 12-31-2025 01-01-2026 to 12-31-2031
DS23-1 DISTRIBUTION DBPR D/DBP RULE 2 RT YR 07-01-2024 to 09-30-2024 07-01-2025 to 09-30-2025
DS23-1 DISTRIBUTION LDCP LEADCOPPER 10 RT 3Y 06-01-2026 to 09-30-2026 06-01-2029 to 09-30-2029
Total Number of Schedules Displayed = 5

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
B23016 PLANT(B23016) SHADY VALLEY LANE 1040 NITRATE 1 RT YR Monitoring Completed 01-01-2025 to 12-31-2025
B23016 PLANT(B23016) SHADY VALLEY LANE 1041 NITRITE 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
Total Number of Schedules Displayed = 2

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SUBMIT LCN CERTIFICATION 2020-12-29 12-29-2020
SUBMIT LCN CERTIFICATION 2023-12-29 12-29-2023
Total Number of Compliance Schedules Displayed = 2

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Wed May 01 23:32:30 EDT 2024